SC200/two hundred 2ton CZPT Cage CZPT Creating CZPT
Part1. Introduction of development elevator:
Adopting innovative technologies the two at home and abroad, SC sequence construction elevator is
novel in design and style, sensible in composition, easy in procedure, convenient in assembly and
disassembly, risk-free an reputable in working. The unit incorporates popular brand electric powered factors
and principal parts in transmission mechanism. The metal composition is made of higher-top quality steel
supplies and welded with CO2 gasoline defend welding. Surface area paint is manufactured with imported raw
resources in amazing, prolonged long lasting colors.
The unit is provided with dependable protection interlock gadgets, safety change, breakage defense
change, higher and lower limits and limit switches, and so on. Progressive dropping protection system and safety
safety hook are offered. The safety style and configuration entirely comply to national
requirements.
Part2.Specification for development elevator:
Item | SC200/two hundred | SS100/one hundred | |
Basic parameters | Cost-free standing height(m) | 50 | 22 |
Max. Lifting peak (m) | one hundred fifty | sixty | |
Rated load(Kg) | 2×2000 | 2×1000 | |
Motor electrical power(Kw) | (2×3) ×11 | 2×7.5 | |
Lifting speed(m/min) | 33 | 24 | |
Principal cable | 3×20mmtwo+2(Countrywide regular) | 3×6mm2+two(Nationwide standard) | |
CZPT area | Mast dimensions(m) | 650×650×1508 | 650×650×1508 |
Major limb content(metal tube) | φ76×4.5/Q345B | φ76×4/two Q345B | |
Cage | Cage inner proportions(m) | 3×1.3×2.four | 3×1.5×2 |
Part3. Rewards for construction elevator:
1.Substantial good quality of motor, low sounds
two.Sturdy load potential, reduced voltage start
three.Sensible optimization design, compact composition, practical set up and debugging
4.Managing the carry elevator prior to the delivery
five.Driving system refueling debugging, customer CZPT refueling
six.Selects the substantial top quality equipment reducer and anti dropping device
Part4. Depth Photo for construction elevator:
Part5. Deal & Delivery:
Package deal: bare by 40HC container.
Shipping and delivery time: thirty times soon after advance payment.
Part6.Service:
one- One 12 months guarantee for entire devices.
2- Delivering totally free fast-wear element.
3- Lower demand for keep on maintenance when warranty is expired.
4- Unique engineer help at any time.
5- cost-free training to end-users.
six- 24 several hours online services and help
Part7. Company Check out:
CZPT CRANES has been in the subject of crane and hoist for much more than 10 several years, so we are
seasoned and professional in production and exporting all varieties of cranes (such as Tower
Crane, CZPT CZPT,Overhead Crane, Gantry Crane, Jib Crane), wire rope electrical
hoist, electric powered chain hoist, hook block and crane other spare parts.
CZPT brand name crane has been exported to several nations around the world like Bangladesh, Vietnam, Autralia,
Ethiopia, Thailand, Singapore, Malaysia, Phillipines, Iceland, Brazil and Kazakhstan and so on. It is
a great thing to see heaps of CZPT CRANES are insatlled in different nations.
Also many of consumers from diverse nations around the world arrive to pay a visit to us to set up a long-phrase company
romantic relationship with us.They mentioned since of our crane, their weighty work gets to be easy.
They gave significantly guidance to us and we realized a lot from them and then we are expanding up together.
Now we are not only business partners, but also shut pals.
Welcome to go to us at your hassle-free time!
Let’s begin our business from your clicking.
Part8. CZPTer Check out:
Part9. FAQ:
If you want to inquiry about our development building hoist, please notify us the details as underneath:
-Raise height? (M)
-Load ability(Kg)
-Cage quantity: solitary or double?
-Nearby voltage(V)
-Other unique prerequisite
Speak to with us straight!
Title: Ivy Lu
Cellular :-17863879946